Shenda International Engineering Co., Ltd. >> Power Transformer with Three-Phase Oil-Ommersed Oltc Transformer

Power Transformer with Three-Phase Oil-Ommersed Oltc Transformer

Power Transformer with Three-Phase Oil-Ommersed Oltc Transformer
Price: US $ 2000-1000000/Piece
Trade Terms: FOB,CIF,DAP
Min Order: 1/Piece
Pay Type: L/C,T/T

Product Specifications

Prod Model: SF11, S11, SFZ11
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Usage: Power
Coil Number: Three-Phase Two-Winding
Coil Structure: Toroidal
Tap Changer: Oltc
Certificates: Ctqc, CE, ISO9001, ISO14001, Cesi
Phase: Three
Coil: Core-type Transformer
Cooling Method: Oil-immersed Type Transformer
Winding Type: Two-winding Transformer
Application: Audio

Product Description

Brief specification. 11 ~330 kV power system of power plant, substation, mining enterprise and etc... Typical projects 1.156MVA 230KV POWER TRANSFORMER FOR ECUADOR STATE POWER GRID 2.63MVA 154KV POWER TRANSFORMER FOR TURKEY 3.50MVA 69KV POWER TRANSFORMER DURING KEMA TESTING 4.30MVA 66KV POWER TRANSFORMER FOR PARAGUAY 4.1.5MVA-23KV POWER TRANSFORMER FOR CHILE SOLAR PLANT Packaging & Shipping Our Services 1. Pre sale service A. Make technical solution B. Send quotation, technical data sheet and drawing C. Make manufacturing plan, testing plan, and shipping plan 2. In sale service A. Supervise the manufacturing schedule totally in accordance with the plan B, send photos to customer during every manufacturing process(hold point) C. Inform the customer one week before testinng. D. Book hotel and ticket for customer if they will come do FAT. 3. After sale service A. Installation and commissioning B. Training the workers B. Quick response within 12 hours any time D, provide 12 months gurantee period normally. Company Information Certificates Workshop Part of equipment Testing center Customer visiting FAQ 1. Q: Are you manufacturer or trading company? A: Manufacturer 2. Q: What is your minimum order quantity? A: 1 set. 3. Q: What is your delivery time? A: Depend on the type of transformer. 4. Q: What is your payment term? A: 30% advance by T/T, 70% before delivery by T/T or L/C Or we can discuss about it. 5. Q: What kind of starndard you follow? A: IEC, ANSI, CSA, GB, etc 6. Q: What kind of supporting documentation you can provide normally A: Quotation, outline drawing, manufacturing plan, quality control plan Testing plan, financial report, type test report(KEMA, CESI), reference list, etc 6. Q: What is your normal wanrranty period? A: 12 months after transformer operation. 7. Q: Can u do installation and commissioningin user's site? A: Yes, we can send our installation team to user's country for service. 8. Q: Do you have any experience in this kind of transformer? A: Yes, we can provide reference list for check.
 Rated power (kVA)  H.V  (kV)  H.V. Tap range  L.V  (kV)  Vector Group  Impedance  (%)  No-load Loss    (kW) On-load Loss   (kW)  No-load Current (%)   Oil Weight (kg) Total weight (kg)   Overall dimension (mm)
 800  35/38.5    ±3*2.5%  6.3  Yd11  or  YNd11  6.5  1.06  9.98  1.05  1650  4790  2870*1810*2570
 1000   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11    6.5  1.26  12.16  1  1760  5210  3150*1890*2650
 1250   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5 1.49  14.63   0.9  2010  6080  3510*2040*2690
 1600   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5  1.8  17.58  0.85  1920  6610 3560*2070*2740 
 2000   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5  2.3  19.24  0.8  2160  7440  3680*2050*2850
 2500   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11  6.5    2.72  20.64  0.8  2580  8240  3780*2220*2890
 3150   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11  7  3.23  24.71  0.72  2680  8540  3850*2310*2950
 4000   35/38.5   ±3*2.5%  6.6   Yd11  or  YNd11  3.87  29.16  0.72  2960  11180  4120*2380*3150
 5000   35/38.5   ±3*2.5%  10   Yd11  or  YNd11  7  4.64  34.2  0.68  3050  12480  4210*2510*3220
 6300   35/38.5   ±3*2.5%  10.5   Yd11  or  YNd11  7.5  5.63  36.77  0.68  4050  15900  4320*3000*3290
 8000   35/38.5   ±3*2.5%  11  Yd11  or  YNd11  7.5   7.87  40.61  0.6  4200  17130  4500*3100*3680
 10000   35/38.5   ±3*2.5%     11   Yd11  or  YNd11  7.5  9.28  48.05  0.6  7480  25230 4560*3500*3750 
 12500   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  8  10.94  56.86  0.56  8010  27000  4590*3580*3830
 16000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  13.17  70.32  0.54  8560  32500  4650*3700*4000
 20000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  8  15.57  82.78 0.54   10030  37770  5200*4200*4280
 25000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11 8  18.96  101.65  0.5  12300  42600  5320*4350*4340
 31500    35/38.5   ±3*2.5%   11    Yd11  or  YNd11   8  22  119.7 0.45   13500 51100   5450*4420*4450
 ``` ```  ```  ```  ```  ```  ```  ```  ```  ```  ```  ```

Shenda International Engineering Co., Ltd. is a professional player in transformer industry, which established in Oct. 2000, located in Zhejiang province of China, holds two production bases and seven sales companies. We always focus on the R&D, have been appointed as a manufacturer of transformers at 330KV levels and below by National Electric Power Corp and Mechanical Industry Union. "EACHER" has been awarded "Famous Brand of Zhejiang Province".

Our annual total production capacity is about 18, 000, 000 kVA, our factory covers an area of 370, 000 square meters and a building area of 100, 000 square meters, with total assets of 350 million CNY and more than 1000 staff members with engineering and technical employees accounting for 21%.

Our main products include 330kV and below&200MVA and below oil immersed power transformers, 110kV and below furnace transformers, 110kV and below rectifier transformers, 35kV dry type transformers, 35kV combined transformer substation, 35kV and below amorphous alloy transformer, 35kV and below reactor etc. All of our products' performance measures up to the standards established by International Electric Committee (IEC).

We have imported many advanced production and testing facilities from Germany and Japan, such as silicon sheet shearing automatic lines, automatic and continuous extrusion lines of electromagnetic wires, Kerosene vapor vacuum drying systems and more than 1, 500 sets of production and complete testing systems for professional transformer production and other testing equipment. We can meet the requirements of customers completely.

There are type test report of CESI Short Circuit Test Report 100MVA/220KV and KEMA Test Report-50MVA/69kV in our company

Send your message to this supplier

  • Shenda International Engineering Co., Ltd.

Other Products From This Manufacturer