Taizhou Remo Plastic Mould Co., Ltd. >> 500ml Microwave Oven Box Mould, Microwave Box Mould, Thinwall Box Mould

500ml Microwave Oven Box Mould, Microwave Box Mould, Thinwall Box Mould

500ml Microwave Oven Box Mould, Microwave Box Mould, Thinwall Box Mould
Supplier: Taizhou Remo Plastic Mould Co., Ltd.
Price: US $ 1/Piece
Min Order: 1/Piece
Quantity::
Trade Terms: FOB,CFR,CIF
contact supplier

Product Specifications

Prod Model: RM0301032
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Name: Microwave Oven Box Mould
Volume: 250ml-1500ml
Material: PP Food Grade
Mould Material: P20 / H13 / 2738 / S136
Base Material: 45#
Mould Life: 1,000,000 Shots Under Correct Operation
Runner System: Hot Runner
Hot Runner Brand: Chinese / Yudo / Hasco / Husky
Ejector System: Stripper Plate
Sample Time: 30-50 Days
Shaping Mode: Injection Mould
Application: Commodity
Installation: Fixed
Process Combination Type: Compound Die
Plastic Material: PP

Product Description



TaIZhou Remo Plastic Mould Co.,Ltd is a professiona thinwall mould manufacturer, we are specialized in various of thinwall moulds such as microwave overn box / lid , airline cups,buckets ,basin and etc.

Our advantages:
1. Professional article & mould design , 3-5 days for complete design
2. Beryllium coppers will be inserted into moulds for better cooling effects
3. Individual cooling lines for better cooling effects
4. Fast cycle time for mass production
5. Different product volume available
6. Weekly report for customer inspection
7. 30-50 days for first trial
8. Qualified Samples before mould shipment to guarantee mould quality
9. Engineers in customer factory for guidance

Business Step 
1.R&D We support customer R&D. Make the files or improve the design if you needed 
↓↓↓
2.Quotation Making Mould Quotation will be finished in  1  day according to information we get
↓↓↓
3.Negotiation  The quality ,price ,material,delivery time .payment item.ect 
↓↓↓
4.Mould Design  3-5  days for mould and product 3D/2D drawing design
↓↓↓
5.Mould According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in  25-60  days 
↓↓↓
6.Mould Testing When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will  send samples  for consumers' reference.
↓↓↓
7.Sample shoot  If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory 
 ↓↓↓ 
8.Delivery  Delivery goods by  sea  or by  air  ,according  customers requirement 

Taizhou Remo Plastic Mould Co., Ltd. Our company is specialized in manufacturing all kinds of plastic mould for 15 years over 25 countries and achieve great success

We also supply the finished products after completing the mould.

Send your message to this manufacturer

  • Inquiry about 500ml Microwave Oven Box Mould, Microwave Box Mould, Thinwall Box Mould

Other Products From This Manufacturer