Categories
| Supplier: | Jiangyin Haoxulai Aluminum Co., Ltd. |
|---|---|
| Price: | US $ 2980/Ton |
| Min Order: | 1/Ton |
| Quantity:: | |
| Trade Terms: | FOB,CFR,CIF |
|
|
| Prod Model: | HXL-006 |
|---|---|
| Markets: | North America,South America,Africa,Mid East,Western Europe |
| Name: | Industrial Aluminium Extrusion Profiles |
| Place Of Origin: | Jiangyin, Jiangsu, China |
| Color: | Any Color Is Availavle as Per Customer Demand |
| Production Capability: | 6500 Tons/Month |
| Surface Treatment: | Anodized, Powder Coating, Electrophoresis, Wooden- |
| MOQ: | 500kgs for Each Profile |
| Samples: | Supply |
| Company Honor: | China Famous Trademark |
| Grade: | 6000 Series |
| Certification: | CIQ |
| Temper: | T3-T8 |
| Alloying Ingredient: | 6063 |
| Window & Door Aluminium Profile: | 60 Series |
| Shape: | Square |
| Polished Aluminum Profile: | Chemical Polishing |
| Alloy: | Alloy |
| Surface Finishing: | Mill Finish, Anodized, Powder Coating... |
| Application: | Industry |
| 1. Material | Aluminium ingot; 6063, 6061, 6082, 6005, T5, T6, |
| 2. Section Shapes | I, U, T, C, Z, L, H, square, round, flat, hollow, t-slot and other complicated shapes by custom design. |
| 3. Surface treating | Mill/Anodized(oxidation)/Sand blast/Powder coating/Electrophoresis/Wood grain. |
| 4. Production lines | 1) 5 melting and casting production lines |
| 2) 25 extruding production lines | |
| 3) 6 anodizing and electrophresis production lines | |
| 4) 2 powder coating production lines | |
| 5) 4 wooden grain production lines | |
| 6) 2 heat insulation broken bridge production lines | |
| 7) 2 wiredrawing and polishing production lines | |
| 5. Quality Control | We operate the most strict quality control system, the detection is from the material, production process, |
| to final product, and ensure the product quality and traceability. | |
| 6.Standard | GB5237-2008 equal to EN12020-1.2(2001) |
| 7.Payment | T/T: 30% for deposit, the balance will be paid before delivery |
| 8.Delivery Time | 1. 15-35 days production. |
| 2. If making a mould, plus 7~10 days. | |
| 9.Packaging Detail: | Inside : packed with plastic film to protect each piece |
| Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized request available | |
| 10.Lead Time | Die Developing and Sample testing: 12-18 days . |
| Mass Production: 20-30days. |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.