Categories
| Supplier: | Foshan Nanhai Bander Decoration Material Co., Ltd |
|---|---|
| Price: | US $ 63-65.28/Piece |
| Min Order: | 1000/Piece |
| Quantity:: | |
| Trade Terms: | FOB |
|
|
| Prod Model: | Bander 300 |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Morphology: | Water Emulsion |
| Application: | Footwear & Leather |
| Material: | PVC |
| Classification: | Room Curing |
| Main Agent Composition: | Inorganic Adhesive Material |
| Bonding Function: | Flooring Adhesives |
| Packaging Details: | Plastic Barrel, 64 PCS 10 Kg barrel one pallart, the Size of the pallart is 1.1m*1.1m*1.15m, |
|---|
| l, 64 PCS 10 Kg barrel one pallart, the Size of the pallart is 1.1m*1.1m*1.15m, |
Bander 300 Vinyl flooring adhesive is a sort of one-component dispersive water-base adhesive, of high initial viscidity and coating property. It is an ideal choice for binding various kinds of coiled or flaky homogeneous penetrative PVC floor. The construction cost is very low, every Kg can cover 7-9 Sqm. Its advantages is as follows:
1. Solventless and environmentally friendly;
2. Simple construction and economical dosage;
3. Of high initial viscosity;
4. Working time as long as 24 hours;
5. High workability;
6. Anti-plasticizer formula;
7. High resistance to extrusion and shock after solidification.
Technical Data:
(Temperature: 20-25, Relative Humidity: 48%-55%)
Time of Binding: Dry binding: 10-30 min for absorptive floor.
Pressuresensitive binding: 30-120 min
for non-absorptive floor.
Floor Welding : About 24 hours later
Bearing Power : About 72 hours
Usage: 7-9 Sqm
Storage and Transportation Temperature: 3 to 50 (avoid frosting)
Temperature resistance after solidification: 0 to 50
Package: 20kg, 10kg,
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.