Categories
| Supplier: | Qingdao Ausense Packing Equipment Co., Ltd. |
|---|---|
| Price: | US $ 160/Meter |
| Min Order: | 1/Meter |
| Quantity:: | |
| Trade Terms: | FOB,CFR,CIF |
|
|
| Prod Model: | CB112 |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Load Capacity: | 40kg/Roller |
| Roller Pitch: | 75/100/150mm |
| Roller Diameter: | 50/60/76mm |
| Certification: | ISO9001 |
| Material Of Frame: | Carbon Steel/Stainless Steel |
| Material Of Roller: | Galvanized Carbon Steel/Stainless Steel |
| Motor Type: | No |

1. Economic and practical, cost-effective;
2. Modular combination, easy to transport and maintain;
3. Reliable operation, low noise and safety;
4. Adjustable legs, wide application scope;
5. Surface electrostatic spray, beautiful appearance;
6. Adjustable convey speed;
7. Large load capability;
8. Lightweight design, fast installation.

| Model | Roller | Frame | Height(mm) | Load Capacity(kg/m) | |||
| Diameter(mm) | Length(mm) | Pitch(mm) | Dimension(mm) | Length(mm) | |||
| G-a-25 | Φ25 | 150-600 | 30/40/50 | 40*20*2 | 1000-3000 | 150-1500 | 30 |
| G-a-38 | Φ38 | 150-800 | 50/75/100 | 60*30*3 | 1000-3000 | 150-1500 | 100-30 |
| G-a-50 | Φ50 | 150-1000 | 75/100/120 | 90*30*3 | 1000-3000 | 300-1500 | 300-100 |
| G-a-60 | Φ60 | 150-1500 | 75/100/120/150 | 90*30*3 | 1000-3000 | 300-1500 | 600-150 |
| G-a-76 | Φ76 | 150-1500 | 100/150/200 | 120*30*3 | 1000-3000 | 300-1500 | 1000-300 |
| G-a-89 | Φ89 | 150-1500 | 100/150/200 | 120*30*3 | 1000-3000 | 300-1500 | 1000-300 |
| Not:The frame can be used carbon steel or stainless steel, roller can be used galvanized steel, stainless steel, pvc, aluminum. | |||||||
Material of frame: carbon steel, stainless steel, aluminum alloy;
Material of roller: galvanized carbon steel, stainless steel, aluminum alloy, PVC.
Packaging: By wooden case;
Shipping: By sea.
AUSENSE's conveyors are designed and shipped to keep things simple! Each conveyor is completely assembled and tested at AUSENSE. It is then partially disassembled into sub-assemblies for shipping. This ensures that set-up is fast and easy once your conveyor arrives.
Lead time: 30 workdays.
Our services
1.24 hours online contact;
2.We will provide installation for you.

Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.