Categories
Supplier: | Shenzhen Hongzhou Technology Co., Ltd. |
---|---|
Price: | US $ 2.54/Piece |
Min Order: | 50/Piece |
Quantity:: | |
Trade Terms: | FOB,CFR,CIF |
![]() |
Prod Model: | HZCO-1083A |
---|---|
Markets: | North America,South America,Eastern Europe,Southeast Asia,Oceania,Mid East,Eastern Asia,Western Europe |
Item: | Heatsink/ Radiator |
Size: | Custom |
Coated Color: | Red/Yellow/Blue/Green etc |
Service: | OEM/ODM |
Usage: | LED/ Electronic Component |
Delivery Lead Time: | 7-25 Working Days (as Per Your Qty) |
Quality Control: | 100% Inspection Before Shipment |
Packing Detail: | Standard Export Packing |
Factory Location: | Shenzhen, China |
Alloy: | Alloy |
Type: | Aluminum Profiles |
Surface Treatment: | Oxidized |
Shape: | Rectangular |
Temper: | T3 - T8 |
Grade: | 6000 Series |
Technique: | Extruded |
Certification: | GB/T |
Application: | Heat Sink |
Item | Alternatives |
Shape | Round, Square, Triangle, Rectangle etc...and Customized shapes are welcomed. |
Alloy | 6061,6082,6060,6005,6N01,5083,5056,3003,7005,7020 Alloy etc. |
Temper | T3,T4,T5,T6,T8 can be discussed. |
Machining & Fabrication | Cutting, Shearing, Deburring, Tumbling, Punching, Drilling, Tapping, Chamfering, Cold-drawing, Honing, Bending, Stamping, Forming, Polishing, Grinding, Brushing, Sandblasting, Welding Numerical Control Lathing, Milling, Sophisticated CNC Precision Machining |
Finishing | Mill finished, Anodized, Hard anodic oxidation,Electrophoresis, Powder coated, Painted, Sliver matt, Sand blasted, PVDF, Silkscreened etc. |
Standard for Extrusion | EN-755-2/3/6/8, BS-1474, BS 1161 (British Standards) |
JIS H4100 (Japanese Standard) | |
AS/NZS1866-1997 (Australian New Zealand Standard) | |
Standard for Fabrication | BS 8118 TS1649 |
Standard for Anodizing | BS1615:1987 |
BS5599:1993 | |
Mil-A-8625E Type I | |
Mil-A-8625E Type III | |
Order Details for hongzhou aluminium heatsink | |
Item | Content |
Minimum Order | 300kg per trial order. One pc of sample free of charge provided by approval and kept for future mass production inspection, delivery fees on buyer. |
Sample Lead time | 15-18 working days include 7-10days making tooling if it's necessary. |
Production lead time | 15~25 working days. |
Documents | Mill Certificates, RoHS, REACH(SVHC), Working Instructions, Inspection Instructions, Packing Instruction, PPAP (including Control Plan, PFMEA etc.), Unpacking/unloading Instructions for customers. |
Packing Method | 1.Standard packing: plastic sheet wrapped for each profile in order to protect the profiles' surfaces, kraft paper wrapped in bundles. |
2. Special packing: wooden cases + Iron trays. | |
3. Bundles or boxes with wooden bars. | |
4. EPE + carton boxes. | |
5. Customized packing methods are welcomed. | |
Loading Weight | 20'GP for 13tons, 40'GP for 20tons. LCL shipment will be acceptable. |
Payment term: | Tooling:100% prepaid by wire transfer. |
Parts: 50% upon order confirmation and balance before delivery by T/T. | |
Other payment terms can be negotiated. |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.