Categories
Price: | US $ 0.05/Piece |
---|---|
Trade Terms: | FOB,CIF,DAP |
Min Order: | 1/Piece |
Pay Type: | T/T,D/P,Paypal,Western Union |
Prod Model: | Yiyong002 |
---|---|
Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
PTFE: | Virgin |
Place Of Origin: | Changzhou |
Best Tolerance: | ±0.005mm |
Lead Time: | 3-5days |
Customized: | Accept |
Structure: | Bushing Insulator |
Material: | PTFE |
Brand: | Yiyong |
Item | High precise machined plastic parts |
Material | PTFE PEEK TPX PEI(Ultem10000 PFA PET-P PCTFE PPS PVDF PAI(Torlon 4203) PI SP-1 PA6/PA66 Delrin Rexolite1422 PPO. etc |
Material Certificate | ROSH MSDS FDA UL |
Tolerance | ± 0.005mm or as per the drawing |
Surface roughness | Strictly according to the request |
Main Process | Machining, Extrusion, Mould Pressing, Turning, Milling, Drilling, grinding , boring , stamping , threading , tamping and so on. |
Production Equipment | CNC lathes machine, CNC milling machine , Cam machine, milling machine, Grinding machine, Tapping machine, Thread rolling machine, Drilling Machine, Stamping machine, Instrument lathe and so on |
Quantity Control |
Full dimensions at sampling inspection , Full inspection once we found any faults, Key dimensions: Do full inspections . Appearance : do full inspection |
R& D | We have 30 professional engineers and experienced workers who are specialized in machining plastic , some of them have more than 10 years experiences |
Supply Chain Process | PPAP, SPC, CPK and so on |
Payment terms | 30%TT as the deposit , the balance before shipment or others |
Samples delivery time | Within one week |
Mass production Lead Time | 7-10 days |
Item | High precise machined plastic parts |
Material | PTFE PEEK TPX PEI(Ultem10000 PFA PET-P PCTFE PPS PVDF PAI(Torlon 4203) PI SP-1 PA6/PA66 Delrin Rexolite1422 PPO. etc |
Material Certificate | ROSH MSDS FDA UL |
Tolerance | ± 0.005mm or as per the drawing |
Surface roughness | Strictly according to the request |
Main Process | Machining, Extrusion, Mould Pressing, Turning, Milling, Drilling, grinding , boring , stamping , threading , tamping and so on. |
Production Equipment | CNC lathes machine, CNC milling machine , Cam machine, milling machine, Grinding machine, Tapping machine, Thread rolling machine, Drilling Machine, Stamping machine, Instrument lathe and so on |
Quantity Control |
Full dimensions at sampling inspection , Full inspection once we found any faults, Key dimensions: Do full inspections . Appearance : do full inspection |
R& D | We have 30 professional engineers and experienced workers who are specialized in machining plastic , some of them have more than 10 years experiences |
Supply Chain Process | PPAP, SPC, CPK and so on |
Payment terms | 30%TT as the deposit , the balance before shipment or others |
Samples delivery time | Within one week |
Mass production Lead Time | 7-10 days |