Categories
| Supplier: | Green Leaf Chemical Limited |
|---|---|
| Price: | Negotiable |
| Min Order: | 1 |
| Quantity:: | |
|
|
| Prod Model: | GLC-EPPC-01 |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Use: | Appliance Paint |
| Level: | Finish Coat |
| Substrate: | Steel |
| Appearance: | Liquid |
| GREEN LEAF CHEMICAL LIMITED | |||||||
|
GREEN LEAF Handbook of industrial protective coatings |
Colored epoxy - polyester powder coating EPPC-01 |
||||||
| Application | The coating has good adhesion, chemical resistance, wear resistance and decoration, the film bright and hard, suitable for home appliances, light industry, electromechanical products, the surface decoration. | ||||||
| Products Introduction | Colored, thermosetting epoxy - polyester powder coating.Consists of polyester resin, epoxy resin, fillers and additives and so on. | ||||||
| Product data | Solid volume | >98% | |||||
| Dry film thickness | 60-100 microns | ||||||
| Theoretical spreading rate | 8-12 square meters / kg | ||||||
| Practical Coverage | General loss coefficient <5% | ||||||
| Works described in detail | Mixing ratio | Single canned | |||||
| Construction Method | |||||||
| Powder electrostatic coating | Recommended, the use of static voltage of 30-80 kV | ||||||
| Static friction spray gun | Not recommended | ||||||
| Electrostatic fluidized bed coating | Not recommended | ||||||
| Thinner | |||||||
| Paint equipment cleaning agent | |||||||
| Use of | No limit | ||||||
| Shelf | One year | ||||||
| Drying time | Baking temperature |
Drying time 180-20min 200-13~15min |
|||||
| Substrate temperature | Surface dry (min) | Completely dry (h) | Repeat brushing interval | ||||
| The shortest | The longest | ||||||
| Storage and management | Storage | This product should be stored in clean dry airtight container to avoid direct sunlight, away from fire. | |||||
| Packing | 20 kgin wooden case or carton | ||||||
| Transportation | Avoid the sun and rain | ||||||
|
Technical requirements and surface treatment |
Before construction in the coating should derust the surface, remove oil and other dirt divisible, and phosphate treatment.If the surface roughness, filled with a conductive putty.Construction site should be clean.Powder on the workpiece, checked in time, if found leaking coated, high-pressure breakdown product powder serious drawbacks,rework or re-painted timely . | ||||||
| Restrictions | |||||||
| Safety measures | See "Summary of Paint" | ||||||
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.