Categories
| Supplier: | Hengshui Jinggong Rubber & Plastic Products Co., Ltd. |
|---|---|
| Price: | US $ 0.01-0.1/Piece |
| Min Order: | 1/Piece |
| Quantity:: | |
| Trade Terms: | FOB,CIF,DAP |
|
|
| Prod Model: | Customized |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Color: | Any Color Per as Requirements |
| Standards: | Chinese Standard, ANSI, DIN, JIS |
| Modling Type: | Mould |
| Tooling: | CNC Lathe |
| Type: | Standard and Customized |
| Certificate: | ISO 9001:2008 & Ts 16949 |
| Item: | Plastic Auto Part |
| Product Type: | Rivet,Gasket ,Spacer,Pipe.Gear,Pulley etc |
| Sample: | Available |
| Tolerance: | 0.01mm |
| Usage: | Household |
| Material: | SBR |
| Product Specification | Product Name | Rubber Flooring Mat |
| Plastic Material | SBR,EPDM.SILICONE ,VITON, etc. | |
| Mould Material | Steel 45#, 50#, 60#, P20. 718, 2083, etc. | |
| Standard | HASCO,DME,LKM,etc. | |
| Color | single-colored, double-colored and multi-colored | |
| Size | as per customer's requirement. | |
| Weight | As Drawings | |
| No. of Cavity | Single / Muti | |
| Runner | Hot/ Cold | |
| Surface Finish | polishing, sand blasting, etc. | |
| Processing | milling, lathe,CNC, hot treatment, grinding, wirecutting, discharge, etc. | |
| Precision | 0.005mm-0.002mm | |
| Use Life Time | 5 years | |
| Certificated | ISO9001:2008; TS16949 | |
| Lead Time | 5-15days | |
| Annual Output | 450 sets of mold | |
| Order Specification | MOQ | 1 |
| Trade Terms | FOB,EXW,CIF | |
| FOB Price | US $ 0.01- 1 / Piece | |
| delivery time | about 4-6 working days, according to your order | |
| Payment term | T/T, L/C, Western Union | |
| Payment condition | 30% deposit in advance, balance 70% before shipment | |
| Shipping | By Sea, By Air and By Express Delivery | |
| Package | fresco bag, wooden case and pallet, be of rust-proof protection and suitable for shipment | |
| Supply Ability | 100000per Month | |
| Port of loading | Tian Jin port | |
| Offer OEM/OED | Yes |
| Rubber products | 3-7 days after the payment |
| Plastic products | 5-7 days after the payment |
| CNC machined parts | 3-10 days after the payment |
| Standard products | 1-3 days after the payment |
Rubber & Plastic products workshop | The professional production workshops for plastic and rubber products will make sure the quality and lead time. |
| Mold making workshop | We have our own workshop to make sure mold precision and lead time. |
| CNC machining workshop | We introduced DMG CNC machining Center from Germany to meet customer's requirements for precision and production capacity. |
| QC & Packaging | To save lead time, the production ,inspection and packaging is doing at the same time. |
| Shipment | We have signed a long-term cooperation contract with international shipping agent and express company, so that the shipping safety and arriving time are secured |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.