Product Specifications
| Prod Model: |
DA -15NF~50NF |
| Markets: |
North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Filter Treatment Delivery: |
23/33/45 Nm3/Min |
| Operational Method: |
Continuous |
| Structure: |
Air Flow Drier |
| Operation Pressure: |
Atmospheric Dryer |
| Movement Way: |
Fixed |
| Heating Mode: |
Convective |
Product Description
Freeze Air Drying Machine
Normal Inlet Temperature Air-cooling Refrigerated Air Dryer:
Working condition and Technical data:
Inlet temperature: Normal inlet temperature≤ 45C
Cooling method: Air-cooling
Ambient temperature: ≤ 38C
Design dew point: 2 ~ 10C
Refrigerant: R22
Inlet pressure: 0.6-1.0Mpa
Pressure drop: ≤ 0.02MPa
1. Perfect refrigerated system configuration. Initial parts come from foreign famous brands to ensure efficient & system reliable running & life as well.
2. Refrigerated & air system is accurate calculated by professional designing engineer, keep 20% capacity.
3. Gas liquid separated thoroughly. Filtering separated with HANKISON element. Thorough separation, avoid the second vapor of water, ensuring dry effect. It better than cyclone separated and it will reach efficiency at 99.99%.
4. Pipeline is made from inner zincification. You can choose working pressure during 0.3~4.5Mpa.
5. Stainless steel pipeline, it's suitable for medicine, food stuff, acid-resistant, alkaline-resistant and erodent-resistant industry.
6. Ripple pipeline of both internal and external of the heat exchanger to increase the using rate of cooling air, adverse current structure, perfect returning temperature and it won't freeze.
7. Evaporator is made from laminose copper pipeline with aluminum flake, high efficiency of heat exchanging of the perfect structure.
8. Good drainage, it adopts 3 grades for draining, can drain lots of condensate water and oil contaminant so as to keep clean and dryness of the system and air, meanwhile reduce system load.
9. Multi-control of circuitry to supply to different users (single control; Integrate circuit, linkage control, PC panel, frequency conversion, etc. )
10. Outer cooling fan with large volume, low noise, and long life if switch frequently.
11. Low condenser made from copper, slow flow, multi-cycling and high heat exchanging rate. It won't freezing and dirty if stop for a long time.
12. Armstrong foam burning resistant & adiabatic material. It's the least loss of cooling air.
13. Protection level of compressor is IP54 (dustproof and spill proof)
|
Model |
DA -15NF |
DA -20NF |
DA -25NF |
DA -30NF |
DA -40NF |
DA -50NF |
|
Capacity |
Nm3/min |
17 |
23 |
27 |
33 |
45 |
55 |
|
Voltage |
V/Hz |
380/50 |
|
Compressor power |
HP |
3.6 |
5 |
5 |
7.5 |
10.5 |
10.5 |
|
Fan power |
W |
160× 2 |
160× 2 |
160× 2 |
180× 4 |
180× 4 |
3× 245 |
|
Connection |
|
DN65 |
DN80 |
DN80 |
DN100 |
DN125 |
DN125 |
|
Net weight |
KG |
330 |
400 |
450 |
780 |
820 |
900 |
Dimension
(mm) |
L |
1230 |
1400 |
1500 |
1650 |
1950 |
2100 |
|
W |
650 |
830 |
930 |
930 |
1050 |
1250 |
|
H |
1180 |
1235 |
1450 |
1580 |
1600 |
1830 |
In 1875, Germany Denair launched the first refrigerant air compressor in the world,
In 1998, Germany Denair set up a representative office in Shanghai, China.
In 2006, Shanghai Denair Compressor Co., Ltd and Denair (Shanghai) Compressor Manufacturing Co., Ltd were established to start to produce and sell air compressor in Chinese market.
In 2009, Denair set up offices in main cities for China and pioneered 4S sales and service model in Compressor industry.
In 2010, Denair set up overseas business department and began to export air compressors and mining equipments to the world. Until now, Denair products have exported to more than 60 countries especially such as South America, Southeast Asia, Middle East, Africa and so on.
In 2013, Denair made an expansion plan to build 12 offices in the world within 5 years. Recently we have had the first overseas office---Surabaya, Indonesia office.
In 2014, Denair prepares to invest and build a new factory which covers an area of approximate 20000 square meters in Jiangsu province. It is expected to be completed within two years.