Product Specifications
| Prod Model: |
GJFJV |
| Markets: |
North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Fiber Cores: |
1 |
| Cladding Layer: |
Tight Buffer |
| Support: |
Aramid Yarn |
| Jacket: |
PVC/Lszh |
| Application: |
Communication |
| Type: |
Single-mode Fiber |
| Certification: |
SGS |
| Brand: |
Sol |
| Sheath Material: |
PVC/Lszh |
Product Description
Optical Fiber Cable Series:
GJFJV Indoor tight buffer
Type: FC-FC,FC-SC,FC-LC,FC-ST,SC-SC,SC-ST
| GJFJV | Structure | Material | Technical Characteristics |
| 1 | Fiber | Silica B6(G657) | Provide greater bandwidth and excellent communication transmission property |
| 2 | Cladding Layer | Tight Buffer | ensure the fibers are better protected |
| 3 | Support | Aramid Yarn | ensure the cable has super crush resistance |
| 4 | Jacket | PVC/PE/Lszh | The out sheath provides good anti-UV radiation performance, leads to more safety and environmental protection |
Note: Other specification can be made upon customer requirements.
| cable core | 1 |
| Fiber Diameter(MM) | 0.6 | 0.6 | 0.9 | 0.9 | 0.9 | 0.9 |
| Outside Diameter(MM) | 1.6 | 1.8 | 2 | 2.4 | 2.8 | 3 |
| Weight(KG) | 2.8 | 3 | 4.25 | 5 | 6.6 | 7 |
| Mini allowable Tensile Strength(N) | short term | 150 | 150 | 150 | 150 | 150 | 150 |
| long term | 80 | 80 | 80 | 80 | 80 | 80 |
| Mini allowable Crush Load (N/100mm) | short term | 500 | 500 | 500 | 500 | 500 | 500 |
| long term | 100 | 100 | 100 | 100 | 100 | 100 |
| Minimum Bending Radius (MM) | Dynamic | 20D | 20D | 20D | 20D | 20D | 20D |
| Static | 10D | 10D | 10D | 10D | 10D | 10D |
| Storage temperature(ºC) | -20~+60 | -20~+60 | -20~+60 | -20~+60 | -20~+60 | -20~+60 |
Application:
optical fiber communication system,
fiber access network,
Optic-fiber Date Communication,
optical fiber catv system,
LAN,
test equipment,
optical fiber sensor.
The Way: Duct, Aerial
Advantage:
---Simple structure
---light weight
---practicability
---simplify the installation
---easily maintenance
Delivery Day: 20days after receiving the T/T payment.
Port: Shanghai Port, Ningbo Port.