Categories
| Supplier: | Shanghai Shenglin M&E Technology Co., Ltd. |
|---|---|
| Price: | US $ 2500-3000/Piece |
| Min Order: | 1/Piece |
| Quantity:: | |
| Trade Terms: | FOB |
|
|
| Prod Model: | GT-WKR-81 |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Product Name: | Integrated Heat Recovery Fresh Air Conditioning Un |
| Mounted Type: | Ceiling Type |
| Supply Air Volume: | 500CMH-10000CMH |
| Cooling Capacity: | 5kw-81kw |
| Inlet/Outlet Chilled Water Temperature: | 7/12 |
| Color: | White |
| Casing: | Double Skin |
| PU Foam: | 48mm |
| Base Channel: | Gl |
| Air Damper: | Manual |
| Type: | Central Air Conditioners |
| Capacity: | 18000-24000 BTU |
| Usage: | Room |
| Indoor Machine Noise: | 36-49dB |
| Certification: | UL |
| China Energy Efficiency Standard: | Level 2 |
| Cooling/Heating: | Cooling/Heating |
| Power Source: | Electrical |
| Power Type: | AC |
| Condition: | New |
| Model | GT-ZKW- |
| Power of air supply fan | 17.3kw |
| Power of electricity heater | 124kw |
| Cold water cooling capacity | 132KW |
| equipment structure | Fully enclosed chamber |
| fault | Touch screen tooltip text | May cause | Correct method |
| Blower is not start | NO | Power supply connection phase error | Will any two relative change of 3 phase |
| NO | Blower rotor, motor bad or overload signal wiring errors | Check the fan, motor and wiring | |
| Electric heater fault | NO | Electric heating overtemperature alarm or electric heating three-phase imbalance | Check the sensor overtemperature protection, measure each phase resistance |
| Examining light fault | NO | Maintenance light damage or repair light wiring errors | Check the maintenance lamp and wiring |
| 1) | Cleaning Inlet air filter | - | Cleaning once a week (The general case) |
| - | Daily cleaning (Very situation) | ||
| - | Every 6000 operation hours evaporator, wash with water | ||
| 2) | Cleaning Heat exchanger | - | Clean the filter every 6000 operation hours By water |
| - | |||
| 3) | Electric heater | - | Daily check whether the electric heater is trouble-free |
| - | Every 8000 a maintenance operation hours. | ||
| 4) | blower | - | Centrifugal rotor balance check - 8000 hours at a time |
| Blower bearing | Check lubricating oil 700 hours at a time | ||
| (An abnormal condition 350 hours) | |||
| 5) | motor | - | Once every 6000 operation hours lubrication |
| - | Complete maintenance (overhaul) - 40000 hours at a time | ||
| 6) | cable | - | Every 6000 operation hours insulation skin and examine whether the wire head intact. |
| 7) | Electric control box | - | Daily observe whether there is a wire heat due to loose |
| (The wire will skin color change due to temperature increase) |