Categories
| Supplier: | Green Leaf Chemical Limited |
|---|---|
| Price: | Negotiable/Piece |
| Min Order: | 1 /Piece |
| Quantity:: | |
|
|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
|---|---|
| Use: | Appliance Paint |
| Appearance: | Liquid |
| Level: | Finish Coat |
| Substrate: | Steel |
| Method: | Spray, Brush or Roller |
| GREEN LEAF CHEMICAL LIMITED | ||||||
|
GREEN LEAF Handbook of industrial protective coatings |
Intumescent steel fireproof coating SP702 |
|||||
| Application | In the steel structure used as a fireproof intumescent coating. | |||||
| Products Introduction | Single cans, solvent-based, high solids intumescent fireproof coating, quick-drying, fast painting. | |||||
| Product data | Solid volume | 70% | ||||
| Dry film thickness | According to the steel shapes and requirements of fireproof to decide | |||||
| Theoretical spreading rate | 0.7m2/kg,according to required volume solids and dry film thickness of 1000 micron meter. | |||||
| Practical Coverage | Allow appropriate loss | |||||
| Volatile Organic Compounds | 375g/KG | |||||
| Works described in detail | Mixing ratio | Single canned | ||||
| Construction Method | ||||||
| Brush or roller | Acceptable (each 250-400 μm) | |||||
| Airless spray |
Recommended by: nozzle width 0.79-0.97 mm (31-38thou) The hydraulic pressure of vent not less than 24Mpa (240 kg / sq cm) |
|||||
| Conventional spray | Not applicable | |||||
| Thinner | Generally do not need, if necessary, use the BW101 | |||||
| Paint equipment cleaning agent | BW101 | |||||
| Use of | No lomit | |||||
| Shelf | ||||||
| Drying time | ||||||
| Substrate temperature | Surface dry (h) | Completely dry (h) | Repeat brushing interval | |||
| The shortest | The longest | |||||
| After the construction of this product, re-coated seal coat as soon as possible. (The shortest time is 2-4 hours) |
5degree centigrade 23degree centigrade Above 35 degree centigrade |
4h 1h 30min |
16-18 8-10 6-8 |
10h 4h 3h |
Renewable | |
| Storage and management | Storage | Dry and cool place | ||||
| Packing | 25KGin 20L containers | |||||
| Flashpoint | Greater than23 degree centigrade | |||||
| Proportion | About 1.35kg / liter | |||||
|
Technical requirements and surface treatment |
According to SSPC-SP1, clean the surface with solvent to remove grease, before the primer,the steel plate should be borax derust to BS7079, PartA1 and Sa2.5 Swedish standards or equivalent standards, the coating can be applied on the primer of the steel which provide anti-corrosion protection required, the primer matching with the paint, the primer case may contact our company. | |||||
| Restrictions | Does not apply to hydrocarbon / petrochemical products of the fireproof, only the recognized primer or paint can support this product , before the topcoat, the product should be stored in dry conditions, the fireproof performance of the product in connection with the film thickness of construction directly inspect regularly to ensure that the required dry film thickness. | |||||
| Safety measures | See "Summary of Paint" | |||||
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.