Qingdao Longwanyuan International Trade Co., Ltd. >> Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop (LWY-PEIS021)

Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop (LWY-PEIS021)

Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop (LWY-PEIS021)
Supplier: Qingdao Longwanyuan International Trade Co., Ltd.
Price: US $ 50-100/Square Meter
Min Order: 1/Set
Quantity::
Trade Terms: FOB,CFR,CIF
contact supplier

Product Specifications

Prod Model: LWY-PEIS021
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Testimonial: "Amazing Experience Working with Longwanyuan"
Technical Innovation: Green Technology
Building Code Adaptability: Suited for Local Building Code
Engineering Resource: 10 Architect Squad
Charity Drive: Large Amount Social Donation
Legitimacy: Under The Scrutiny of Sat
Lifespan: 50 Years
Warranty: 30-Year Limited Warranty
Size: Customized
Door Options: Rollup Door
Carbon Structural Steel: Q235
Residential Wall Structure: Wall Stud
Type Of Steel For Building Structure: High-Strength Steel
Member: Steel Column
Trademark: Quality Carbon Structural Steel and Alloy Structural Steel
Connection Form: Bolt Connection
Type: H-Section Steel
Application: Steel Fabricated House
Standard: GB
Forming: Hot-Rolled Steel

Product Description

Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021) Feature As a new form of construction option and emphasize on steel frabrication,Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021) is mostly made up of steel column,steel beam, steel truss and other steel components which are crafted by profile steel and steel plate.The connection way mainly adopt welding,bolts and rivets.The cladding system apply for corruaged steel sheet and sandwich panel For Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021) without the floor support plate Main structure:steel column,steel beam,column bracing,wall and roof purlin,horizontal bracing and other supporing steel components.It usually goes for H sectional steel,C or Z profile steel and other profile steel member. A:Craftship of main structure components-steel column and beam:CNC flame cutting-H bean assemblage-SAW welding-Riveting and welding parts Surface treatment:painted or galvnised treatment.Whether painted or galvanised,the steel components need to go through shot blasting processing firstly. There are 3 times of painting when adopting painted option-primer,intermediate coat and topcoat.They refer to epoxy primer,polyurethane coating and acrylic polyurethane topcoat to perform out the magnificant anti-corrasive property. Galvanised process:Another better option is galvanised surface treatment.It devides into 2 kinds of galvanise treatment-electrogalvanising and hot-dip galvanising. B:craftship of main structure components-roof and wall purlin(C/Z profile steel),column bracing,horizontal bracing and other profile steel components.Also there are usually 2 kinds of surface treatment-painted or galvanised. When it comes to the production of C/Z profile steel or other profile steel components,the follwing procedures are involved: blowing flattening forming stereo stype form strengthening length measurement flush the lacing hole flush ellipse connecing hole final forming and cutting The following charts are the specification of C/Z profile steel. 2.Cladding system: For Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021),the wall and roof cladding system apply for corrugated steel sheet and sandwich panel: A:For sandwich panel,therer are several kinds of sandwich panel: Polystyrene panel, glass wool sandwich panel, rock wool sandwich panel PU panel. Thickness is usually 50mm,75mm and 100mm b:For corrugated steel sheets,here are the common used rib style of steel sheets: 3.Installation of Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021): I.Installation of steel column: II.Installation of steel beam: Installation of wall and roof purlins and other steel components: Wall and roof cladding system installation: Packaging & Shipping Packaing:The Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021) package is nude cargo but Longwanyuan shall accompany steel structure compoments with cotton blanket on certain parts to prevent the components from collision.(like shown in the picture) Shipping: For the Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop(LWY-PEIS021)the shipping is usually with 20ft/40ft shipping container.Longwanyuan shall assign a special team work on the loading to the shipping container in order to put each components in right position and minimum the collison damage during the shipping.
Offer Request
Type of Building   
Please state type of building, ie: workshop, warehouse, hall, hangar, farm, roof structure or other construction
Dimension width length wall height total height
       
Construction Site  
Roofing and Walls (1)sandwich panel                                                        (2)profile steel sheets                                                          (3)steel sheet+glasswool blanket                                                        (4) no walls-only roof with structures
Contact Name  
Company Name  
Phone Number  
Email  
Additional info  
Send us sketches, drawings or the project, if you have
Our company supplys different kinds of products. High quality and favaroble price. We're pleased to get your Inquiry and we will come back to as soon as possible. We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with good quality at the reasonable price.

Send your message to this manufacturer

  • Inquiry about Pre-Engineering Industrial Steel Structure for Warehouse/Garage/Workshop (LWY-PEIS021)

Other Products From This Manufacturer