Product Specifications
Prod Model: |
CGF18-18-6 |
Markets: |
North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
Function: |
Washing Filling Capping |
Control: |
PLC |
Machine Material: |
Stainless Steel 304/316 |
Capacity: |
2000b/H-20000b/H |
Type: |
Volumetric Filling Machine |
Automatic Grade: |
Automatic |
Material Type: |
Liquid |
Filling Valve Head: |
Multi-Head |
Dosing Device: |
Capacity Cup |
Structure: |
Rotary |
Packaging Type: |
Bottle |
Packaging Material: |
Plastic |
Filling Principle: |
Gravity |
Product Description
Pure water bottle filling machinery
Description:
This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit: Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.
Pure water mineral water bottling machine washing part:
The rotary wheel is a fully SUS304 stainless steel welded structure.
The machine applies unique overturning bottle clamp. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
The rinser is driven by driving system positioned inside machine frame via gear transmission.
Transfer Starwheel
Made of stainless steel of superior quality.
Equipped with bottle jam protection device.
Pure water mineral water bottling machine filling part:
Rotary wheel fully made of stainless steel SUS 304.
Gravity filling method.
Filling valves are made of SUS316L.
Filling valves are reasonably structured with accurate filling.
Filling flow can reach 200ml per second.
Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
Level of cylinder is controlled with float-ball.
Filler is driven through gears inside the machine frame.
Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck
Pure water mineral water bottling machine capping part:
Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
The capper is equipped with inlet bottle detection switch.
Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.
Model | CGF16126 | CGF18186 | CGF24248 | CGF32328 | CGF404010 |
Heads of washing, filling , sealing | 16-12-6 | 18-18-6 | 24-24-8 | 32-32-10 | 40-40-12 |
Production capacity (bottle/hour) | 2000-4000 | 5000-7000 | 8000-12000 | 12000-15000 | 16000-20000 |
Suitable bottle diameter(mm) | φ=50-100 H=170 330-1500ml |
Spraying pressure | 2~3 |
Motor power | Main motor 1.5kw | Main motor2.2kw | Main motor3kw | Main motor4kw | Main motor7.5kw |
Power of outer vacuum pump | 0.75 | 1.1 | 1.5 | 2.2 | 2.2 |
overall dimension (LxWxH) | 2100x1400x2500 | 2460x1720x2650 | 3100x2100x2650 | 3500x2500x2650 | 4600x1800x2650 |
Weight | 2500 | 3500 | 4200 | 5500 | 6800 |
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under One Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
Connection:
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: sanxing Industry park,
Zhangjiagang city, jiangsu province
Zhangjiagang Beyond Technology Co., Ltd. Has more than 15 years experiences on beverage filling and packing machinery. We devote ourselves to the development, research and production of liquid food and beverage packing and filling industry and automatic blow molding machine in China.
For beverage machine, our Main products including:
The capacity of 2000-- 40000 BPH for hot filling (juice and tea filling) and MID-temp filling and aseptic cold filling lines.
The capacity of 2000-- 40000 BPH for mineral water and purified water producing line.
The capacity of 2000 -- 36000 BPH for carbonated beverage and cold filling producing line.
The capacity of 1000_8000BPH for vinegar and alcohol producing line. The capacity of 100 -- 2000 TBH for 3 gallon and 5 gallon barrel producing line.
The capacity of 2000--10000 BPH for milk producing line.
All kinds of water treatment equipment.
PET perform inject and blowing-stretching machine.
Plate and tube UHT device, and CIP system.
We carry a strict quality management system in accordance with CE and ISO9001 requirements. We have established a complete processing line including design and manufacture and sale and after sale service. Our products are sold well around the world.
We are proud to adhere to our company slogan "Engineering Excellence". Please be free to contact us for more information and we are ready for making business relations with you in the near further.