Categories
| Supplier: | Weifang Hongyuan Waterproof Materials Co., Ltd. |
|---|---|
| Price: | Negotiable/Piece |
| Min Order: | 3/Ton |
| Quantity:: | |
| Trade Terms: | FOB,CFR,CIF |
|
|
| Prod Model: | Biogo-D |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Product Name: | Two Component Polyurethane Waterproof Coating |
| Usage: | Projects Waterproofing |
| Application: | Wide |
| Service Life: | Long |
| Drying Method: | Air Drying |
| Main Raw Material: | Polyurethane |
| Method: | Brush |
| Appearance: | Liquid |
| Certification: | ISO9001 |
| Color: | Red or Customized |
| Substrate: | Ceremic, Steel, etc. |
two component polyurethane waterproof coating
1. Product Description:
Double component waterproofing coating belongs to solidify waterproof materials, and the Group A is isocyanate terminated pre-polymer polycondensated by polyether and isocyanate, Group B is colored liquid composed of plasticizer, curing agent, thickening agents, coagulant agent and filler, Mix Group A and B evenly as rate and brush on the waterproofing substrate surface, form a elastisic and rubber-like coating film through cross-linking and solidifying at normal temperature , which plays a role of waterproofing.

2. Main features:
High elasticity and extensibility of film forming, seamless
weather resistance, acid alkali resistance and strong adhesive properties
high performance of waterproofing and ageing resistance
Environmental protecting product

3. Application:
1.It is suitable for basement,toilet,swimming pool, pond, refrigeration storage.
2.It is specially suitable for underground project where the substrate is moist and structure is complex. It also can be used to non-exposed roof project.

4. Installation:
Make primer: Mix DPU and solvent by A:B:Solvent=1:2:1, then brush primer on the foundation until it is Mix A:B=1:2. Scratch the coating by 3 times. The first layer curing needs 20-24 hours. When the first layer is solidifying, do the second layer. The direction of the second layer should be at right angles to the first layer. Then repeat the third one. If add protective layer, before the third layer is cured, scatter clean sand on its surface. After the membrane is cure, can begin the protective layer construction.
| No | Item | National Standard I | National Standard II | ||
| 1 | Solid Content %≥ | 92 | |||
| 2 | Dry Time h≤ | Dry time of Outside | 8 | ||
| Dry time of Inside | 24 | ||||
| 3 | Fracture tensile strength Mpa≥ | 1.9 | 2.45 | ||
| 4 | Breaking elongation,(normal temperature) %≥ | 450 | 450 | ||
| 5 | Water impermeability, 0.3Mpa 30 min | Impermeable | |||
| 6 | bending at low temperature degree≤ | -35 | |||
| 7 | Bonding strength of Moistbase Mpa ≥ | 0.5 | |||
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.