Categories
| Supplier: | Dongguan Wai Tak Lung Machinery Ltd. |
|---|---|
| Price: | US $ 2000-3200/Piece |
| Min Order: | 1/Set |
| Quantity:: | |
| Trade Terms: | FOB,CFR,CIF |
|
|
| Prod Model: | PEFZ560-03-00-D |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Type: | Belt-Wrap |
| Applied Wire Diamete(Mm): | 1.0~3.0 |
| Wheel Size(Mm): | 560 |
| Tension Control Method: | Powder Clutch 1.2 Kg.M |
| Precision: | Precision |
| Certification: | CCC |
| Demoulding: | Automatic |
| Heating System: | Electric |
| Function: | Lubrication |
| Mould Life: | >1,000,000 shots |
| Automatic Grade: | Automatic |
| Condition: | New |
| Customized: | Customized |
| Warranty: | 12 Months |
NO | Machine Model | Application | Machine name | Type | Applied Wire Diamete (mm) | (Wheel Size) | Tension Control Method | Accumulating Length |
| 1 | PRSZ-00-SEI19-A | For small size wire in insulation line after pay off | Tension Controller (300) | Double wheel | Φ1.0~3.0 | Φ300 | Powder clutch 2.5kg.m | |
| 2 | PECJ-00-D | For medium size wire in insulation line after pay off | Tension Controller (400) | Double wheel | Φ2.0~5.0 | Φ400 | Powder clutch 5kg.m | |
| 3 | PRSZ-00-SEAC01-A | For medium size cable in sheathing line after pay off | Tension Controller (500) | Double wheel | Φ2.0~18 | Φ500 | Powder clutch 25N.M | |
| 4 | PLJ6536-00-YNC02-A | For medium wire in sheathing line after pay off | Tension Controller (800) | Double wheel | Φ2.0~10 | Φ800 | Powder clutch 25N.M | |
| 5 | PEFZ560-03-00-D | For small size wire in insulation line after dual cone pay off | Brake Stand | Belt-wrap | Φ1.0~3.0 | Φ560 | Powder clutch 1.2 kg.m | |
| 6 | PLCZ-00-YNT02-A | For big size wire in sheathing line after pay off | Tension Controller | Caterpillar Belt | Φ5~30 | none | Powder clutch 2.5kg.m | |
| 7 | PZL300-00-B | For small wire in low speed insulation line after pay off | Weight Dancer | Double wheel | Φ1.0~3.0 | Φ500 | by counter weight | |
| 8 | PDBZ-00-YNC02-A | For solid wire in insulation line or rewinding machine after pay off | Weight Dancer | Rocker Arm | Φ1~3.5 (for solid wire) | Φ300 | by counter weight | |
| 9 | PDLZL-00-CRI01-A | For big size wire in rewinding line before take up | Weight Dancer | Rocker Arm | Φ10~30 | Φ130 | by counter weight | |
| 10 | PCXL2400-00-F | For normal size wire in rewinding line after pay off or before take up | Vertical Dancer | Vertical | Φ1~10 | Φ300 | by air cylinder adjustment | 10M |
| 11 | PCXL520-00-B | For big size wire in rewinding line after pay off or before take up | Vertical Dancer (heavy) | Vertical | Φ3~20 | Φ520 | by air cylinder adjustment | 10M |
| 12 | PCXL-00-RRK01-A | For normal size wire in insulation line after pay off | 2.5m Vertical Accumulator 2.5 | Vertical | Φ1~10 flexible wire | Φ400 | Powder clutch 10kg.m | 10M |
| 13 | PCXL-00-KDK05-A | For normal size wire in insulation line after pay off | 3.5m Vertical Accumulator 3.5 | Vertical | Φ1~10 flexible wire | Φ400 | Powder clutch 10kg.m | 45M |
| 14 | PCXL520-00-A | For normal size wire in insulation line after pay off | 5m Vertical Accumulator 5 | Vertical | Φ1~10 flexible wire | Φ520 | Powder clutch 20kg.m | 192M |
| 15 | PSMG50-00-B | For small wire in insulation line before take up | 12m Accumulator 12 | horizontal or slanting | Φ1~3 flexible wire | Φ180 | Powder clutch 10kg.m | 200M |
| 16 | PSM12-00-ZC01-A | For normal size wire in insulation line before take up | 12m Accumulator 12 | horizontal or slanting | Φ1~12 flexible wire | Φ300 | Powder clutch 10kg.m | 210M |
| 17 | PSMG12-00-QX01-B | For normal size rigid wire in insulation line before take up | 12m Accumulator 12 | horizontal or slanting | Φ1~18 flexible wire | Φ420 | Powder clutch 20kg.m | 145M |
| 18 | PSM20-00-MZ03-C | For small wire in high speed insulation line before take up or auto coiling machine | 20m Accumulator 20 | horizontal or slanting | Φ1~3 flexible wire | Φ180 | Powder clutch 10kg.m | 540M |
| 19 | PSM20-00-SEAC01-A | For normal size rigid wire in insulation or sheathing line before take up | 20m Accumulator 20 | horizontal or slanting | Φ3~25 flexible wire | Φ560 | Powder clutch 20kg.m | 200M |
| 20 | PSM12-00-YNC02-A | For rigid wire in physical foaming or chemical foaming line | 12m Accumulator 12 | horizontal or slanting | Φ1~10 flexible wire | Φ420 | Powder clutch 20kg.m | 145M |
| 21 | PSMG800-00-A | For big size cable sheathing line in before take up | Standing Accumulator | floor standing | Φ5~50 flexible wire | Φ800 | by torque motor 25 N.M | 133M |
| 22 | DDG30805E65 | for flexible flat cable | Multiple wheel flat cable Accumulator | Multiple wheel | Φ5~20 flexible wire | Φ180~400 | Powder clutch 10kg.m | 60 M |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.