Categories
Supplier: | Jiangyin Haoxulai Aluminum Co., Ltd. |
---|---|
Price: | Negotiable/Ton |
Min Order: | 1/Ton |
Quantity:: | |
Trade Terms: | FOB,CFR,CIF |
![]() |
Prod Model: | HXL-003 |
---|---|
Markets: | North America,South America,Africa,Mid East,Western Europe |
Name: | Industrial Aluminium Extrusion Profiles |
Place Of Origin: | Jiangyin, Jiangsu, China |
Color: | Any Color Is Availavle as Per Customer Demand |
Production Capability: | 6500 Tons/Month |
Surface Treatment: | Anodized, Powder Coating, Electrophoresis, Wooden- |
MOQ: | 500kgs for Each Profile |
Samples: | Supply |
Company Honor: | China Famous Trademark |
Surface Finishing: | Anodic Oxidation |
Grade: | 6000 Series |
Certification: | CIQ |
Temper: | T3-T8 |
Alloying Ingredient: | 6063 |
Window & Door Aluminium Profile: | 60 Series |
Shape: | Square |
Polished Aluminum Profile: | Chemical Polishing |
Alloy: | Alloy |
Application: | Industry |
1. Material | Aluminium ingot; 6063, 6061, 6082, 6005, T5, T6, |
2. Section Shapes | I, U, T, C, Z, L, H, square, round, flat, hollow, t-slot and other complicated shapes by custom design. |
3. Surface treating | Mill/Anodized(oxidation)/Sand blast/Powder coating/Electrophoresis/Wood grain. |
4. Production lines | 1) 5 melting and casting production lines |
2) 25 extruding production lines | |
3) 6 anodizing and electrophresis production lines | |
4) 2 powder coating production lines | |
5) 4 wooden grain production lines | |
6) 2 heat insulation broken bridge production lines | |
7) 2 wiredrawing and polishing production lines | |
5. Quality Control | We operate the most strict quality control system, the detection is from the material, production process, |
to final product, and ensure the product quality and traceability. | |
6.Standard | GB5237-2008 equal to EN12020-1.2(2001) |
7.Payment | T/T: 30% for deposit, the balance will be paid before delivery |
8.Delivery Time | 1. 15-35 days production. |
2. If making a mould, plus 7~10 days. | |
9.Packaging Detail: | Inside : packed with plastic film to protect each piece |
Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized request available | |
10.Lead Time | Die Developing and Sample testing: 12-18 days . |
Mass Production: 20-30days. |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.