Categories
Price: | Negotiable/Piece |
---|---|
Min Order: | 1 /Piece |
Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
---|---|
Use: | Appliance Paint |
Appearance: | Liquid |
Level: | Finish Coat |
Substrate: | Steel |
Method: | Spray, Brush or Roller |
GREEN LEAF CHEMICAL LIMITED | |||||||
GREEN LEAF Handbook of industrial protective coatings |
Compartment epoxy paint (chemicals, etc.) EPTANK 366 Pink, beige, gray |
||||||
Application | A chemical paint used as a loading compartment, for a variety of intense loading of cargo, including: solvents and chemicals; refining and crude oil products; animal and vegetable oils. | ||||||
Products Introduction | Two compartments modified epoxy paint cans. | ||||||
Product data | Solid volume | 55% | |||||
Dry film thickness | 100 microns wet film thickness equal to 182 microns | ||||||
Theoretical spreading rate | 4.2m2/kg, (in the stated volume solids and film thickness conditions.) | ||||||
Practical Coverage | Allow appropriate loss | ||||||
Works described in detail | Mixing ratio | A: B = 6:1 (weight ratio) | |||||
Construction method | |||||||
Airless spray |
Recommended use: Tip range 0.45 ~ 0.66mm(21~27) Total fluid pressure 17.6MPa (176kg / cm2) |
||||||
Brush or roller | Applies only to a small area. Need to repeat the coating, in order to achieve the required dry film thickness. | ||||||
Conventional spray | Not recommended | ||||||
Thinner | Not recommended, in exceptional circumstances BW 103 (maximum of 5% of the total volume) | ||||||
Reaction induction time | 15min (at 10 degree centigrade ~ 35 degree centigrade conditions) | ||||||
Paint equipment cleaning agent | BW103 | ||||||
Use of |
5 degree centigrade~5hour 23 degree centigrade~2.5hour 35 degree centigrade~1.5hour |
||||||
Drying time | |||||||
Substrate temperature | Surface dry (h) | Completely dry (h) | Repeat brushing interval | ||||
The shortest | The longest | ||||||
5 degree centigrade 23 degree centigrade 35 degree centigrade |
8 3 1.5 |
18 16 4 |
36h 7h 12h |
35days 28days 14days |
|||
Storage and management | Storage | Store in a cool and dry environment. | |||||
Flashpoint | Greater than 23 degree centigrade | ||||||
Packing |
A: 18 kg in the 20 liter container B: 3 kg in 3 liter containers |
||||||
Proportion | 1.45 kg/ liter | ||||||
Technical requirements and surface treatment |
*According to SSPC-SP1 solvent cleaning the surface, to remove surface oil. * Remove weld slag and sharp edges when needed * Blasting to near white SSPC-SP10 in the standard or Sa2.5 SIS055900. * Coating before the oxidation, if oxidation has occurred, to be fully re-oxidized part of the blast to the required standards. * Re-painted in the specified intervals after re-painted coat this product. |
||||||
Restrictions |
Consult our company to determine that the coating applied to the load compartment of the goods, the paint drying times and overcoating intervals may change due to various site factors. Such as the shape of the compartments and ventilation rate. |
||||||
Safety measures | See“Summary of Paint" |