Categories
| Supplier: | Luen Cheong Printing Equipment Ltd. |
|---|---|
| Price: | US $ 3000-3850/Set |
| Min Order: | 1/Set |
| Quantity:: | |
| Trade Terms: | FOB,CFR,CIF |
|
|
| Prod Model: | SD5000 |
|---|---|
| Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Machine Size: | 5000*1000*1300mm |
| Oven Size: | 4000*800*400mm |
| Mini Order: | 1 Set |
| Waranty: | 1 Year |
| Feature: | 20PCS Infrared Heater, with Extract System |
| Customer: | France, Sudan, USA etc |
| Heating Device: | Infrared Heater |
| Power Supply: | 380V |
| Wattage: | 20kw |
| Operational Method: | Continuous |
| Structure: | Oven |
| Operation Pressure: | Atmospheric Dryer |
| Movement Way: | conveyor |
| Heating Mode: | infrared heater |
| Product name | IR Drying tunnel/IR oven/IR drying machine |
| Model No | SD5000 |
| Certificate | CE, ISO-9001-2000 |
| Brand Name | LC, China |
| Description |
Suit to IR drying , Paper IR PRITNING , IR POLISHING , PVC, PET , PCB after printing IR printing, electronic product UV sparying , paper IR pritning, packing products UV drying . Infrared heater can reach 1000-1200 hour. Driven by well-known motor, stepless speed adjustment. The Conveyor speed can be adjusted according to product' s characteristics |
| Advantage |
1. The conveyer speed can adjustment according to the products drying condition; 2. Conveyer belt mabe by tefulong materials; 3. Famous brand UV lamp installed ; 4. Cooling fan installed on the side to remove the heat in curing chamber; 5. Tabletop working and save room area |
| Parameter |
Temperature range: Normal~200º C L working power: AC 110V/220V 50Hz L constant temperature will be 5º C more or less L temperature resolution: 1º C L machine size: 5000x1000x1300mm L oven size: 4000x800x400mm |
| Usage | Electron, Hardware, Auto, Toys, Gifts, Plastics parts, Plastics products, House appliances, work of art, Stationery, Ornament, cosmetic, sports apparatus . |
| Free fittings |
1. 1 pcs UV lamp 2. 1 bag Work box 3. 1 pcs English operating instruction |
| Shipping way | By sea, by air, by express |
| Delivery time | Within 7 days from the receipt of payment |
| Loading seaport | Shenzhen or Hong Kong, China |
| package | Plywood case |
| Price term | FOB Shenzhen, CFR, CIF, FCA, EXW etc |
| Payment term | 100% T/T in advance(negotiation) |
Manufacturers Directory | Hot Products | China Products | Companies List| Resources Directory | News | Sitemap | Disclaimer | About Us | Contact Us | Cautop|
Copyright 2003-2024 China Manufacturer Directory.